Abstract

Phasor measurement unit (PMU) plays an important role in operation, protection, and control of modern power systems. PMU provides real time, synchronized measurements of bus voltage and branch current phasors. It is neither economical nor possible to place all the buses of the system with PMUs because of their high cost and communication facilities. Attaining the minimal number of PMUs to access an observable power system is the main objective of optimal PMU placement (OPP) problem, which is solved by utilizing different techniques. Graph theoretic and mathematical programming procedures have been first introduced to solve OPP problem, aiming to access power system observability. Heuristic method as an experience-based technique is defined as a quick method for obtaining solutions for optimization problems, in which optimal solutions are not achievable using mathematical methods in finite time. This paper provided the literature review on different heuristic optimization methods to solve the OPP problem. Then, the available methods were classified and compared with different points of views. Results from the tests of researches on heuristic algorithms with and without the consideration of zero-injection buses were compared and superiorities of the introduced heuristic concepts were demonstrated with relative to each other.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.