Abstract

Based on Genetic Algorithms (GAs) with matrix approach, the presented method introduces a pre-decision variable to suit the precedent relationship of activities in project scheduling problem and this could avoid the modification of traditional genetic algorithm operators and chromosome structures which will trigger great time consuming for searching solutions. Two types of scheduling problem in construction industry are considered in this paper, traditional contracts with fixed finish time constraint and the Build-Operate-Transfer (BOT) which has a flexible deadline with a reward/penallty regulation. Details of the problem formulation and encoding method are shown and six trial tests are performed with good evolution results.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.