Abstract
Based on Genetic Algorithms (GAs) with the matrix approach, the presented model introduces a pre-decision algorithm combining electronic spreadsheets to visually unfold the precedent relationship of activities in project scheduling problems. Trying to avoid large modification to traditional genetic algorithm operators and chromosome structures, the proposed method is improved by reducing time consumption in searching solutions. To demonstrate the technique, two types of scheduling problems for the construction industry are described and tested: traditional contracts with fixed finishing time constraint and the Build–Operate–Transfer (BOT) contracts which have a flexible finishing time with a reward/penalty arrangement. The results clearly show that the model can generate a promising upgrading when compared with the use of traditional GA method in chromosome structures and searching time.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.