Abstract
In construction projects, critical path method (CPM) has been mainly used for project scheduling and planning in the past. The main objective of CPM is to find critical activities and schedule the project in such a way that the project makespan is minimized. Resource allocation project scheduling problem has been one of the most popular issues among construction management researchers in the past decades. Resource leveling problem in the real world is also important and should be considered in the planning of a project. On the other side, since these two objectives have opposite goals in the projects, considering both of these objectives simultaneously has always been a challenging problem. In this paper, we try to solve these problems at the same time. For this purpose, two new metaheuristic algorithms so-called colliding body optimization and charged system search are utilized. Two case examples are solved to show the applicability and performance of the considered algorithms.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Iranian Journal of Science and Technology, Transactions of Civil Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.