Abstract
This paper systematically introduces the comprehensive application of BIM technology in the whole life cycle of pre-fabricated building. The background project is Vanke industrial dormitory building and the main application points include: BIM design, business management, technology management, progress and cost management, quality and safety inspection, personal management and BIM maintenance.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: DEStech Transactions on Engineering and Technology Research
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.