Abstract

This paper systematically introduces the comprehensive application of BIM technology in the whole life cycle of pre-fabricated building. The background project is Vanke industrial dormitory building and the main application points include: BIM design, business management, technology management, progress and cost management, quality and safety inspection, personal management and BIM maintenance.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.