Abstract

With such characteristics as deep buried, complex geological conditions and sensitive surrounding environment, a metro section lateral pump house in Zhengzhou is conducted using horizontal ground freezing reinforcement method within metro tunnel, combined with mine excavation and lining. In order to ensure the expected effect of freezing reinforcement, BIM technology is applied in layout test of freezing holes. A 3D parameterized freezing pipe model adapted to stakeout data is build, and mathematical relationship of main model parameters is obtained. The rationality of freezing hole layout is verified through collision detection analysis and formation prediction analysis of frozen soil wall, providing reference for application of BIM technology in freezing design of complex cross passage.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.