Abstract

This paper is based on BIM chemical plant upgrade project energy centre plant design, BIM Technology is applied to the project pipeline comprehensive design, using the Revit to complete the professional system modelling, using Naviswork to analyse the collision conflict between various disciplines and generate collision conflict report, through the pipeline comprehensive adjustment optimization model, improve the design quality.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.