Abstract

A lot of large area lands were made in China coastal areas by dredging sludge from the sea. The dredged fill ground had a very low bearing capacity which should be increased as soon as possible to meet the requirements of constructions. However, conventional vacuum preloading could not be used for this purpose because the sand cushion could not be laid on the sludge ground due to the very low bearing capacity. To solve this problem, a modified vacuum preloading method without sand cushion was proposed. This method has been successfully tested and applied in the reclamation project in Wenzhou. Based on this project, the technological process and the key technology were introduced and the reinforcement effect was analyzed. Project results showed the modified vacuum preloading method could achieve a good reinforcement effect on large area dredged fill ground in a short period. It is worth to promote the application of this method in coastal reclamation projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.