Abstract

Purpose: This research aims to identify risks at the time of fulfillment of the requirements set by the customer and determine their mitigation.
 
 Method: In order to achieve the goal, researchers use the PMBOK approach that focuses on risk management by creating WBS and RBS. From the existing risks assessed using the FMEA method by conducting a survey to get the S, O and D values then calculating the RPN. 
 
 Result: the highest RPN value in this study is 330 at risk 5.2. The understanding of PIC system and procedures in making the system, based on the result of brainstorming is decided that the mitigation is recruiting employee who is experienced in applying BSCI and factory evaluation audits due to the unavailability of employees who will become PIC compliance.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.