Abstract
At present, the scale of China’s construction projects is gradually expanding, which has greatly promoted the rapid development of China’s economy. Construction engineering is an organic system, which has the function of complexity and variability. Therefore, we must do a good job in cost management control, which can reduce the overall budget of the project. At the same time, we must do a good job in cost management, which can strictly control the consistency between cost and budget. Therefore, through computer BIM, we can control cost management and coordinate cost management, which will improve the management and control of complex projects. First of all, this paper analyzes the difference between project cost management control and project cost management. Then, this paper constructs the collaborative management mode of cost management control and project cost. Finally, some suggestions are put forward.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.