Abstract

This paper takes the deep foundation pit project of Lanzhou Hospital of Traditional Chinese Medicine as the background. The design and construction of the foundation pit is relatively difficult due to the complex environment around the pit, the dense surrounding buildings, the complex underground soil layer and the influence of groundwater on the pit. In order to detect problems in the construction process, the pit was monitored in real time through an automated monitoring system for the whole process of excavation and backfilling of the pit. The analysis of the actual monitoring data shows that: (i) the support scheme of bored pile + prestressed anchor cable support combined with concrete corner bracing can meet the design of this type of foundation pit without causing disturbance to the surrounding buildings; (ii) combined with the actual case of the influence of groundwater on the excavation process of the foundation pit, it proves that the real-time measurement by the robot can timely detect the safety hazards caused by external factors during the construction process of the foundation pit. The project is a very important one for deep pits and complex pits. This project provides a good reference case for deep foundation pits and foundation pit projects in complex environments.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.