Abstract

Estimation of the time required for software development is a difficult task of software project development. Function Point Analysis (FPA) is among the most commonly used techniques to estimate the size of software system projects or software systems. Several studies have already proposed to extend FPA, mainly aimed at achieving greater precision in the point assessment of systems of greater algorithmic complexity. This work proposes the use of concepts of fuzzy logic to combine factors to adjust the time estimated to implement requirements of software systems. A software system was developed to automate the time estimation that is adjusted using factors combined as fuzzy rules.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.