Abstract

Taking the 500 kV double-circuit transmission line jacking project as the background, aiming at the overturning phenomenon that may occur in the foundation of the high-voltage transmission tower jacking process, the finite element software is used to establish a three-tower six-line tower-line coupling system calculation model, considering the wires Numerical analysis of wind load response, self-weight effect of transmission tower, and tower-line coupling tension. The research results show that the y-direction bending moment value of each independent foundation will be significantly changed after the jacking, and the y-direction bending moment value of the sole base No. 2 will have a greater increase. In addition, the y-direction bending moment values of the upper and lower connecting beams cast in-situ after the transmission tower is lifted will suddenly increase, indicating that when the high-voltage transmission tower is lifted in situ, each foundation must be strengthened to avoid longitudinal restraints at the bottom of the foundation. Sudden instability of bending moment.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call