Abstract

Productivity level was inseparable with production site layout, facility and operation personnel arrangement, the production site facility and production line were optimized basis of IE through detailed analysis of automobile roof rail production process. Added quick die change equipment, online polish machine, measured several parameters before and after improvement using time measure method. The improvement enable the whole production line staff reduced 2, production beat increased 17%, saturation of personnel increased 26%, the production line balance and productivity were improved, brought good economic benefit for the enterprise.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call