Abstract

There are many factors influencing the cost of transmission line project. The complex construction environment, different construction level and other factors could lead to large differences in the cost of comparable transmission line projects under the same voltage level. Based on the division of the transmission line projects, this paper analyzes and identifies the main factors affecting the cost of transmission line project. The random forest model is used to select 15 of the influencing factors. And then, this paper verifies the main factors selected, providing references for prediction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.