Abstract

There are many factors affecting the cost of transformer substation project. The project cost difference is large and the data is discrete. It brings great difficulties to the classification analysis, index preparation and control management of project cost. Based on the project division of transformer substation project, this paper analyzes and identifies the main factors affecting the construction cost of transformer substation project, and uses the Random Forest model to measure 25 of the influencing factors, selects the key influencing factors to provide reference for the cost prediction of transformer substation project.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.