Abstract

By numerical calculation, it analyzed the seepage effects of plastic concrete cut-off wall in in construction period. On construction period, the seepage flow from inside of channel to outside at unit length is 0.753m3/h. The seepage flow from under plastic concrete cut-off wall is 0.646m3/h which is 85.79% of total seepage flow. Under certain condition on operation period, the seepage flow from inside of channel to outside at unit length is 0.394m3/h. The seepage flow from under plastic concrete cut-off wall is 0.358m3/h which is 90.86% of total seepage flow. Under another condition on operation period, the seepage flow from inside of channel to outside at unit length is 0.249m3/h. The seepage flow from under plastic concrete cut-off wall is 0.236m3/h which is 94.78% of total seepage flow. In It showed the plastic concrete cut-off wall has obvious effect.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call