Abstract

The 500kV Yangdong Line II starts at Shanxi Yangcheng Power Plant and ends at Shandong Dongming Switch Station. It was completed and put into operation in May 2000, with a total length of 246.465 km. In this paper, through the field investigation and weather operation statistics, as well as the metal micro-analysis of the broken strand OPGW sample, it is concluded that the root cause of the broken strand is that the continuous current discharge process of the lightning channel can keep the arc root for a long time, which may cause ablation on the surface and even the inside of the single stranded wire. This paper also put forward measures to prevent such failures.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.