Abstract

Relying on the Beihuan tunnel project, the numerical calculation of the excavation of the newly built tunnel down-traversing the existing expressway is carried out. The ground settlement deformation law of the expressway under different excavation schemes is analyzed, and the applicability of Peck formula in the calculation of the influence scope of ground settlement is discussed. The results show that: the numerical calculation of surface settlement range corresponds to Peck formula predicted result well.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.