Abstract

Water Jacket Furnace is a kind of indispensable equipment in the process of oil and gas field production, gathering and transportation. It is mainly responsible for the warming and energy supply of gathering and transportation system. After production, the oil of natural gas firstly enters the Water Jacket Furnace for pressure regulation, thermal insulation and then received the processing of separation, filtration, pressure regulation and metering; natural gas containing more impurities will gradually form sediment and eventually block the snakelike coil, resulting in Water Jacket Furnace heat exchange failure; with the continuous development of the oilfield construction, the application of Water Jacket Furnace continues to increase, and the blockage phenomenon gradually increases in correspondence; under the circumstance of being unable to solve the Water Jacket Furnace blockage by high pressure differential, this paper presents the operation method of blockage solution via fresh water injection for discussion.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.