Abstract

One of the efforts to achieve the goals of construction project in terms of cost, quality and time is to replace conventional methods with more modern ones, namely by applying precast concrete. Precast concrete products, especially for buildings, are quite varied, one of them is Hollow Core Slab (HCS). Supported by previous research which explains that precast concrete floor slabs can save processing time compared to conventional floor slabs. Therefore, it is necessary to identify factors and variables that affecting the selection of conventional and precast
 floor plates on time performance and how the influence of the X variable (Factors) on the Y variable (Time performance).The results showed that the most affecting factors in the selection of conventional floor slabs on time performance were manpower factor with variable number of workers (41.3%), location factor with variable distance of batching plant to project site (19.8%), and also technical factors with shop drawing revision variable (by 41.8%). As for, the most affecting factors in the selection of precast concrete floor slabs on time performance include manpower factors with worker’s expertise variable (29.7%), and technical factors with shop drawing revision variable (by 38.4%).

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call