Abstract
This research was conducted at PT. TRIN which produces automotive spare parts. The Line Balancing Assembly method is used to minimize the time needed to complete one unit of product. This research was conducted by collecting primary data and conducting interviews with workers at each work station. The results of the study show that the application of the Line Balancing Assembly method can increase productivity at PT. TRIN on the X30 production process originally the number of production reached 26 pcs/hour , after the Line Balancing Assembly method was applied it became 28 pcs/hour or an increase of 7.70%. This study provides recommendations for other companies wishing to increase productivity by applying similar methods to their processes.
Published Version (Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have