Abstract

Taking the construction project of a new bridge pile foundation above an in-service subway in Xi’an as an example, considering the influence of horizontal symmetrical construction of pile foundation hole forming on the deformation of different sections of asymmetric tunnels, a three-dimensional finite element geometric model of pile-tunnel-soil is established based on ABAQUS software. Through the numerical simulation analysis of the structural deformation behavior of the in-service subway tunnel under the two construction stages of pile foundation hole forming and concrete pouring, the horizontal and vertical deformation laws of the key points of the in-service subway tunnel caused by the construction of the adjacent new pile foundation are analyzed from different angles.The calculation results show that: the deformation of the interval tunnel is mainly caused by vertical displacement, resulting in overall settlement of the tunnel. However, the settlement value is within a controllable range and does not affect the normal operation of the in-service subway tunnel. The concrete pouring stage has a greater impact on subway tunnels. The research work has important reference value for the reasonable safety monitoring and control of similar construction projects.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call