Abstract
This paper discusses the impact of the sub-hourly unit commitment problem on power system dynamics. Such an impact is evaluated by means of a co-simulation platform that embeds a sub-hourly stochastic mixed-integer linear programming security constrained unit commitment (sSCUC) into a time domain simulator, as well as includes a rolling planning horizon that accounts for forecast updates. The paper considers different sub-hourly sSCUC resolutions (i.e., 5 and 15 min) and different wind penetration levels (i.e., 25 and 50%). The focus is on the transient response of the system and on frequency variations following different sSCUC strategies, and different sSCUC wind power uncertainty and volatility. The case study consists of a comprehensive set of Monte Carlo simulations based on the 39-bus system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Electrical Power & Energy Systems
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.