Abstract
Objectives: Analyze the human capital in the Federal Electricity Commission (CFE), in the city of Villahermosa to design an improvement proposal. Carry out a diagnosis on the human capital of the Federal Electricity Commission (CFE). Methodology: The research will be descriptive because the independent variables will be described, as well as the research variables. This investigation is also considered as non-experimental, because the variables cannot be manipulated, the data will be obtained from the heads of departments. Surveys were carried out, which are based on the 10 elements that make up the TIEP (Integral Technique for Productivity Evaluation). Contribution: Once the results are obtained, a proposal is designed for the company through an improvement Model, to increase the productivity of human capital
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.