Abstract

The paper presents the results from studies of both the active and reactive power of a wind power plant, connected in parallel with a high power electrical grid. The wind power plant is with SCIG asynchronous generators and a step-up substation 21/115 kV, realized by means of cable lines. The analyses have been made with the help of a computer model, synthesized in MatLab environment. The dependencies of the power, the power factor and the phase angle on the mechanical moment of the generator shaft in the cases of only one generator operating and all generators operating have been obtained. The inductive reactive power for compensating the capacitive power of the wind plant has been calculated at turned off generators. The parameters of the inductive compensating reactor have been determined. The capacitive power for compensating the inductive reactive power has been defined at loaded generators.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call