Abstract

Deep foundation pit of subway station project are affected by the geological conditions with rich water and sand seriously. So the construction has a greater difficulty. We have to analyze the measured data and study on the deformation law of retaining structure and soil. That can be used as theoretical verification about the design scheme of retaining structure. The results show that this design scheme can be used as the support form in the similar geological conditions.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call