Abstract

In order to develop marginal oil reservoir and save drilling cost,since 2006 Shengli Oilfield began to do research of slim hole drilling technology. After a summary trial of 13 wells in Shengtuo area, Analysis the existence of technical difficulties and solutions of slimhole. Preliminary formed a set of suitable technology for Shengli oil field, especially the slim hole drilling in Shengtuo area, The average penetration rate reached 18.39m/h, The average drilling period is 10.69d. The experience provides reference to the same kind of wells in shengli oilfield.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call