Abstract

Road construction delay is considered to be repetitive problems in the construction industry causing various negative effects on project success in terms of time, money, and quality. Therefore it is essential to identify and analyze the causes of highway construction delay. The main purpose of this study is to identify the causes of delay affecting highway construction projects. 40 delay causes were identified using a literature review and were categorized into 13 groups. Data were collected through a questionnaire survey. Questionnaires were distributed to 425 respondents out of which 388 were received. Values of Frequency and severity of occurrence of delay causes are calculated for getting values of importance index. Risk factors are ranked using the importance index. Results indicate that the top five harmful delay factors are change in design, Delayed payment, Inaccurate details in drawings, Financial difficulties, and Poor project management, and least five harmful delay factors are Physical obstruction during construction, Road blockage, and traffic at the construction site, Labor dispute, Sudden change in government law and skilled labor. The findings can help the Project team to decrease highway construction delays.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.