Abstract
The construction industry has had the highest accident rate worldwide for decades. Identifying risks as early as feasible during the pre-construction or design phase is essential to preventing construction accidents. To generate a structured list of risks, a Work Breakdown Structure (WBS) is used to identify risks. Although numerous studies have proposed using Work Breakdown Structure (WBS) to identify risks, no one has analyzed the relationship between Work Breakdown Structure (WBS) and risk to reduce construction accidents. Consequently, this study aimed to investigate the impact of Work Breakdown Structure (WBS) risk during the design and construction phases on construction safety performance. The analysis of relationships will be conducted using statistical methodologies. The study's findings will demonstrate that Work Breakdown Structure (WBS) risk affects construction safety performance.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Science, Technology & Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.