Abstract

Abstract Ignalina NPP was operating two RBMK-1500 reactors which are under decommissioning now. In this paper, analysis on radwaste management alternatives during the dismantling of systems with low level contamination and different types of components in buildings 117/1 and V1 are presented. After situation analysis and collection of the primary information related to components' physical and radiological characteristics, location and other data, two alternatives for radwaste management during the dismantling were formulated and evaluated: the first one (A1) when the decontamination of the dismantled components is performed (if it is reasonable), and the second one (A2) when no decontamination of the dismantled components is performed and after the dismantling, the components are routed to appropriate waste storage or disposal sites. To select the preferable alternative, MCDA method – AHP (Analytic Hierarchy Process) is applied. Hierarchical lists of decision criteria, necessary for assessment of alternatives performance, are formulated. Quantitative decision criteria values for these alternatives are calculated using software DECRAD, which was developed by Lithuanian Energy Institute Nuclear Engineering Laboratory. Qualitative decision criteria are evaluated using expert judgment. Analysis results show that alternative A1 has a preference against alternative A2.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.