Abstract

PurposeSelecting a proper project delivery system is one of the critical issues for the success of a project. This paper discusses the application of project delivery systems in China and the existing project delivery system selection methods, analyzes project objectives and indicators influencing the selection of project delivery systems, and aims at finding an appropriate method to select project delivery systems.Design/methodology/approachA survey was conducted by postal questionnaire and Multivariate Statistical Analysis was applied to analyze the project data. A robust model was developed to analyze the selection of project delivery systems.FindingsThe results of survey and analysis show that design‐bid‐build (DBB)/project management (DBB+PM), design‐build (DB)/engineering, procurement and construction (EPC)/Turnkey, multi‐stage DB/EPC and EP+C are commonly used in China. The differences between DBB and DBB+PM, and differences between DB/EPC and Turnkey in China are not significant. Weights of project objectives in each project delivery system and the ranking of indicators influencing the selection of project delivery systems are acquired.Originality/valueAnalysis was conducted with a robust model instead of traditional model in consideration of efficiency. This research may assist owners in Mainland China in selecting project delivery systems, improve project performance, and encourage efficiency in project delivery process.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call