Abstract

Maccon Generasi Mandiri Makassar company is one of a manufacturing company engaged in the production of light brick AAC (Autoclaved Aerated Concrete). PT. Maccon Generasi Mandiri Makassar has a production capacity of 15024 〖 m〗^3 in a month or 180288 〖 m〗^3 in a year. However, with this capacity, the company is often unable to meet high consumer demand of 181450 〖 m〗^3 in a year due to less than optimal engine performance, a number of hours of work and an unbalanced workforce in the producing light brick of ACC (Autoclaved Aerated Concrete). This requires the company to plan the optimal production of capacity in order to fulfill the consumer demand in a timely and appropriate amount so that the expected of company profits will be increased. The purpose of this research is to plan production capacity in the future based on the demand rate of the consumer using the Rough Cut Capacity Planning (RCCP) with the method is Bill of Labor Approach (BOLA) technique. Based on the data processing which has been done, the recommended made were a combination of engine additions and working time. This is realized to fulfill the lack of production capacity. For the January Period = 19872 hours/month, February = 19008 hours/month, March = 19872 hours/month, April = 19008 hours/month, May = 18144 hours/month, June = 18144 hours/month, July = 19872 hour/month, August = 18144 hours/month, September = 17280 hours/month, October = 18144 hours/month, November = 18144 hours/month, December = 17280 hours/month.

Highlights

  • The capacity of the maximum capability of a system or production unit to complete a work target

  • This is realized to fulfill the lack of production capacity

  • Maccon Generasi Mandiri Makassar company is one of a manufacturing company engaged in the production of light brick AAC (Autoclaved Aerated Concrete) with the brand Maccon AAC (MAC)

Read more

Summary

Introduction

The capacity of the maximum capability of a system or production unit to complete a work target. Production capacity that can be produced within a certain period of time is using available resources [1]. Production capacity planning is the process of selecting resource requirements such as machine, labor in accordance with the company production planning [2]. Maccon Generasi Mandiri Makassar company is one of a manufacturing company engaged in the production of light brick AAC (Autoclaved Aerated Concrete) with the brand Maccon AAC (MAC). Maccon Generation Mandiri company conducts the production process using a mixer machine, which functions to mix cement, silica sand, lime, water, and some additives. The oven was conducted by using an autoclave machine. With this process, the company is able to produce brick with a production capacity of 72 m3 /hours.

Objectives
Methods
Results
Conclusion