Abstract

Tarabunga Pier is a pier located in Palipi District, Samosir Regency, North Sumatra Province which serves the Tarabunga – Tamba route. In organizing crossings, tariffs greatly influence the level of transportation services, especially in fulfilling community services. However, the tariff for the Tarabunga-Tamba route currently in effect is not in accordance with Minister of Transportation Regulation Number PM. 61 of 2021. This research aims to determine the ship operational costs (BOK) for the Tarabunga-Tamba route based on Minister of Transportation Regulation Number PM. 61 of 2021. The research methodology used is direct observation in the field, interviews, documentation and literature/institutional studies. Then, to analyze it, we are guided by Ministerial Regulation Number 61 of 2021 concerning Management of River and Lake Transportation. The analysis used is load factor analysis, ship operational cost analysis and unit rate analysis. The results of this research are that the rates set are not in accordance with the results obtained by researchers based on the calculation of ship operational costs (BOK), namely IDR 1,000/passenger and IDR 3,000 /motorcycle. The tariff for the Tarabunga – Tamba route currently refers to Regent Regulation Number 49 of 2017 (Horsik – Ajibata). This is not relevant because the track distance is different. Meanwhile, based on the Ability to Pay calculation of Rp. 2,733 and Willingness to Pay Rp. 1,008.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.