Abstract

In order to solve the problems existing in the cost management of distribution network engineering, this paper analyzes the factors influencing the cost of distribution network engineering by using analytic hierarchy process. The analysis results show that the factors influencing the cost of distribution network engineering in the design stage, construction stage and completion stage have a great impact on the cost of distribution network engineering. Then the fishbone diagram analysis method is used to focus on the specific influencing factors of the above three parts for further analysis, so as to find the problems existing in each influencing factor, determine the key points that need to be improved and solved, and then put forward effective targeted control measures to provide guidance and reference for the cost management of distribution network engineering.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.