Abstract
The Tangjiashan landslide dam was formed during the Ms8.0 Wenchuan earthquake in 2008 and posed high risks to 1.2 million people downstream the dam. A human risk analysis model (HURAM) reported in the companion paper is applied to evaluate the human risk in the Tangjiashan landslide dam failure. The characteristics of this landslide dam are introduced first. The breaching parameters in two cases (i.e., the actual case and a high erodibility case) are predicted with a physically based model, and the flood routing processes in these two cases are simulated using numerical analysis. The population at risk downstream of the landslide dam is then obtained based on the results of the flood routing simulations. Subsequently, the human risks are analyzed with HURAM using Bayesian networks. Fourteen influence parameters and their interrelationships are considered in a systematic structure in the case study. A change in anyone of them may affect the other parameters and leads to loss of life. HURAM allows not only cause-to-result inference, but also result-to-cause inference by updating the Bayesian network with specific information from the study case. The uncertainties of the parameters and their relationships are studied both at the global level using multiple sources of information and at the local level by updating the prior probabilities.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.