Abstract
AbstractThe simulation of run‐off in Alpine catchment areas is essential for the optimal operation of high head storage hydropower plants (HPPs) under normal flow conditions, but also in case of flood events. A conceptual semidistributed numerical approach is presented, combining hydrologic modelling and operation of hydraulic works. Spatial rainfall and temperature distributions were taken into account for simulating the dominant hydrologic processes, such as glacier melt, snowpack constitution and melt, soil infiltration and run‐off. The object‐oriented modelling tool allowed run‐off generation, simulation of the operating mode of complex HPP and its impact on the downstream river network for different scenarios. The paper briefly presents the hydrologic model and then the application for the upper Aare catchment in Switzerland, where about half of the area is operated by the Oberhasli hydropower scheme. The development, calibration and validation of the hydrologic model are discussed. Finally, the retention effect of the existing reservoirs and their management, including preventive turbine operations, on flood routing in the Aare River upstream of Lake Brienz is presented for the 2005 historical flood event.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.