Abstract

The implementation of construction projects generally carried out in construction contracts results in community apathy because they are not actively involved in the planning, implementation and maintenance operations of construction projects. The government launched the National Community Empowerment Program (PNPM). One of the PNPM programs initiated was the Rural Infrastructure Development Program (PPIP). Election Implementation of a construction project using a construction contract or community empowerment by considering several criteria and sub criteria so that the implementation of construction projects can be carried out effectively and efficiently. The measures discussed in implementing construction projects are time, cost, quality, community participation, administration, and independence. The Analytical Hierarchy Process (AHP) method is used to analyze the results of the questionnaire so that the criteria and sub criteria weighted as a consideration for the selection of construction projects. Based on the results of the analysis, we obtained the weights of the construction project implementation criteria, namely: time with a load of 0.198, costs with a capacity of 0.203, quality with an amount of 0.178, community participation with an amount of 0.118, administration with a weight of 0.139 and independence with a weight of 0.139. Then it is known that the construction contract weight is 1.045 and the influence of community empowerment is 0.955.Furthermore, the calculation of alternative weights carried out so that the criteria obtained: time, quality and administration took into account in the construction contract. Considerations: costs, community participation, and independence are taken into consideration by the project in community empowerment. Based on the results of the analysis shows that the implementation of construction projects is better done using a construction contract because it explicitly incorporated in its accountability. The cost criteria are the most significant factor and sub-criteria the accuracy of the start schedule of implementation occupies the highest score in the selection of the application of the construction contract.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call