Abstract
Analyses computer integrated manufacturing systems with the real‐time constraints under the condition that time to repair depends on human experience and can be fuzzy. Proposes an approach which combines probability and possibility measures. Illustrates the impact of the growth of human experience on the reliability characteristics with an application example.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have