Abstract
The large number of inductive loads used, namely 3-phase induction motors and welding machines, has caused a low power factor in the electrical system at PT. Sunrise Steel. In this industry there are 2 production sites for coated steel named Continous Galvalume Line 1 and Continous Galvalume Line 2. There are 6 transformers that supply power to the two places, but there are 2 transformers that have a very low power factor, where Transformer 1 (Continous Galvalume Line 2) a capacitor bank has been installed but the power factor is still low, which is 0.67 and Transformer 3 (Continous Galvalume Line 1) is 0.66. The addition of Capacitor Bank is of course very much needed to increase the value of the power factor in the two electrical systems. This research targets an increase in power factor to 0.98, where Transformer 1 (Continuous Galvalume Line 2) requires the addition of a 17.831 uF capacitor and Transformer 3 (Continous Galvalume Line 1) requires a 2948,81 uF capacitor using an automatic compensation technique. The compensation method used in both is the global compensation method, a capacitor will be installed on each main LVMDP. ETAP Power Station software is used to simulate the results of installing capacitor banks.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.