Abstract

Globalisation influences the manufacturing sector to practice the best manufacturing system to sustain in competing business environment. The outcome of this article elucidate the effect of transition from traditional manufacturing practice to lean manufacturing system in a paint brush company located in South India. The existing practice utilises push system where the large batches of raw material are routed from one operation to another along a production line. In this case study, a lean manufacturing system along with sequential implementation of lean elements such as value stream mapping, group technology, cellular manufacturing, U-line manufacturing, etc., is premeditated for reducing the cycle time to relax the Takt time and stabilising the production process. The implemented lean manufacturing system increases the productivity, reduces work-in-process and lead time. The performance measure of lean system such as bottleneck cycle time, production capacity, lead time and work-in-process inventory are evaluated by instant part transfer rate through spread sheet model.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.