Abstract

<span style="color: black; font-family: 'Times New Roman','serif'; font-size: 12pt; mso-fareast-font-family: Calibri; mso-bidi-font-family: Calibri; mso-ansi-language: EN-US; mso-fareast-language: ZH-CN; mso-bidi-language: AR-SA;" lang="EN-US">As the EPC (Engineering Procurement Construction) model became one of the widely used models in the areas of local and international construction, project management based on the EPC highlights its importance. EPC project commonly refers to the four stages of the project implementation process which are design, procurement, construction and delivery to a construction enterprise for integrated management.</span><span style="color: black; font-family: 'Times New Roman','serif'; font-size: 12pt; mso-fareast-font-family: Calibri; mso-bidi-font-family: Calibri; mso-ansi-language: EN-US; mso-fareast-language: ZH-CN; mso-bidi-language: AR-SA;" lang="EN-US">The advantage is that it can unleash the leading role of the design by overall optimization in the implementation of the project to realize reasonable cross and full coordination in the various stages of design, procurement and construction, achieving savings in investments as desired by the owners, shorten the construction period, improve the quality and other targets</span>.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.