Abstract

<p>As the EPC (Engineering Procurement Construction) model became one of the widely used models in the areas of local and international construction, project management based on the EPC highlights its importance. EPC project commonly refers to the four stages of the project implementation process which are design, procurement, construction and delivery to a construction enterprise for integrated management.The advantage is that it can unleash the leading role of the design by overall optimization in the implementation of the project to realize reasonable cross and full coordination in the various stages of design, procurement and construction, achieving savings in investments as desired by the owners, shorten the construction period, improve the quality and other targets.</p>