Abstract

Abstract: Contruction project is began by the necessity of the owner who than passed on to other parties such as consultant, contractor, sub-contractor, supplier, labour that are interlinked into a chain of construction project . The relationship between these parties put contractor as the chain in this relationship, known as construction supply chain (CSC). In CSC there are possibilities of risks that can increase the project cost, thus impact on the declining of the contractor’s profit. These source from three flows of supply chain system, that is flow of informations, flow of material and flow of funds. This research aims to analysis the supply chain risks on building construction project in Bali that affect on the declining of contractor’s profit. Data was collected using a questionnaire survey. The respondents were selected based on purposive sampling method, covers the experst on building construction projects. The method of analisys covers risk assement and linear regression analysis. The risk assement analysis shows that there are 26 major risks (6 risk in flow of information, 16 risks in flow of material and 4 risks in flow of fund). The regression analysis suggests that risks sourced from flow of informations is the most significant factor that increase the projects cost, therefore mitigating focused on the flow of information with develop project’s administration as shop drawing, work permits, material’s approval, completeness of contract and daily coordination.

Highlights

  • Contruction project is began by the necessity of the owner

  • labour that are interlinked into a chain of construction project

  • thus impact on the declining of the contractor's profit

Read more

Summary

Introduction

Contruction project is began by the necessity of the owner who than passed on to other parties such as consultant, contractor, sub-contractor, supplier, labour that are interlinked into a chain of construction project. Di dalam ketiga aliran ini memiliki kemungkinan kejadian risiko yang dapat meningkatkan biaya proyek sehingga menyebabkan penurunan keuntungan kontraktor. Sehingga dalam penelitian ini akan dilakukan analisis risiko pada aliran supply chain proyek konstruksi gedung di Bali.

Objectives
Results
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.