Abstract

PT PJB Muara Karang power plant is an industry with a large electrical energy consumption for auxiliary power. In ISO50001 itensitas Energy Consumption (IKE) is a great need to audit energy consumption. In the contract the company's performance also set a percentage of personal use should not exceed 6% of the electricity production. Currently Posentase usage of own consumption at power plant unit 5 is greater than the power plant unit 4. It is necessary for an energy audit for the usage of its own in order to decrease the percentage of personal use in the power plant 5 0.5% of the current conditions and find energy savings opportunities in the power plant unit 5.To analyze this problem using energy audits, analyzes the performance test method using "gate cycle" and testing the quality of the voltage source by using the power quality measurement analysis. Having found the equipment with the largest energy comsumtion fish bone tools used to find the main cause of this disorder.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.