Abstract
The addition of UGC cable (Under Ground Cable) and equipment rating’s change for the reconfiguration from Air Insulated Swichgear into Gas Insulated Switchgear at Pesanggaran substation. Therefore need to reset distance relay settings so that relays can work more selectively and reliably. Using manual and simulation calculations, the results obtained from distance relay reset GIS Pesanggaran - GI Pemecutan Kelod, with impedance value 1 = 2.055 ?, zone 2 = 5.73 ? and zone 3 = 11.01 ? with time delay at zone 1 = 0 seconds, zone 2 = 0.4 seconds and zone 3 = 1.6 seconds. This setting shows that the reload setting value can secure the line from the 3 phase short circuit fault obtained from the simulation results.
Highlights
The addition of UGC cable (Under Ground Cable) and equipment rating’s change for the reconfiguration from Air Insulated Swichgear into Gas Insulated Switchgear at Pesanggaran substation
the results obtained from distance relay reset GIS Pesanggaran - GI Pemecutan Kelod
reload setting value can secure the line from the 3 phase short circuit fault obtained from the simulation results
Summary
Tujuan dari penelitian ini adalah sebagai berikut: 1) Menentukan setting distance relay pada. SUTT 150 kV GIS Pesanggaran arah Pemecutan Kelod. 2) Simulasi arus gangguan hubung singkat pada SUTT 150 kV GIS Pesanggaran arah Pemecutan Kelod menggunakan software ETAP SUTT 150 kV GIS Pesanggaran arah Pemecutan Kelod. 2) Simulasi arus gangguan hubung singkat pada SUTT 150 kV GIS Pesanggaran arah Pemecutan Kelod menggunakan software ETAP
Published Version (Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have