Abstract

The study was conducted at Bumi Surabaya City Resort (Bumi Surabaya) which is a 5-star hotel in Surabaya. Bumi Surabaya already has Standard Operating Procedures (SOP) but the SOP is not relevant to the current condition. This study aims to update the SOP cash disbursement cycle of Bumi Surabaya, POS update needs to be done because SOP is a work guide for employees. In addition to updating SOP cash disbursement cycle, this study also evaluates the control activities for improved SOP cash disbursement cycle to be improved. The type of research used in making this research is case study. The focus of the research is the internal and external cash disbursement cycle, where there are 3 methods of internal cash disbursement and 4 external cash disbursement methods. The updated SOP is a simple POS and pilot project for Bumi Surabaya, Bumi Surabaya is expected to periodically evaluate POS so that the POS owned is relevant to the organization's latest condition.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.