Abstract

This paper aims to analyze the cycle time of the assembly line of one of the weapons products at PT. Pindad (Persero) and to explore the effective methods to improve its performance. The method used is a quantitative analysis of assembly data involving 155 components and 56 tasks distributed over 43 work stations, accompanied by document analysis, especially on scientific literature, to elaborate various appropriate methods to become solutions to the problems encountered. The results show that almost all workstations had a cycle time greater than the takt time. It is also known that there is an imbalance of existing workstations, with the lightest workload lasting 67 seconds while the largest workload lasting 253 seconds. The results of the elaboration of the literature show that several potential methods can provide solutions to the problems encountered by considering the characteristics of the assembly line with a straight-line configuration. This study contributes to the literature by analyzing cycle times and assembly line balances in the defense industry relatively rarely studied in Indonesia.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.