Abstract
Industrial plantations are production forests that have monoculture species (1 species), which take up to 5 years to be ready for harvest. Before harvesting, activities are carried out it is necessary to analyze the cost of harvesting,where the aim is to find out the magnitude of the profits obtained by the company. The purpose of this study is to analyze the cost of harvesting and analyze the productivity of wood from harvesting activities at HPHTI PT. PSPI Petapahan District. This research was conducted in May - June 2019. The sampling method in this study used a purposive sampling system. Based on the results of research conducted at PT. PSPI Petapahan District, the production costs for harvesting are activity are obtained, the amount of costs for felling and dividing the stems of IDR 27.235/hour, the costs for stacking IDR 200.584/hour, costs for stripping bark of IDR 203.991/hour, costs for skidding IDR 204.091/hour, the fee for loading and unloading skid is IDR 200.584/hour and the cost for loading to truck is IDR 200.584/hour. While harvesting productivity for each activity is felling productivity of 20,97 m3/hour, division of stems of 35,25 m3/hour, stacking of 21,10 m3/hour, stripping bark of 39,50 m3/hour, skidding of wood by 21,23 m3/hour, skid loading and unloading of 49,61 m3/hour and loading to trucks of 12,40 m3/hour.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.