Abstract

To create prosperity for the people of Papua Province. The government has made one of the programs, namely the construction of the Digoel Dam in Boven Digoel Regency – Papua. The successful construction and operation of a dam requires a comprehensive evaluation of the design prior to commencement of the construction process. This study aims to analyze the initial settlement that occurred in the Digoel dam type earth fill and rock fill. Initial settlement analysis was carried out using the modulus parameter obtained from the literature. SIGMA/W software has been used to estimate dam crest settlement due to static loading. From the results of the analysis of the initial settlement of the dam with the rock fill and earth fill types, it is accepted that the maximum permissible settlement is 1.59%.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.